Work on the Footers etc.

After the conference was over, Michael, Papa and I went up to Allegue and worked on the property for a few days.  Papa preached on Sunday, and I got caught up with some friends over the weekend.  Then Monday and Tuesday we poured footers.  Here are some pictures.  The red lines are generally over the footers, the yellow lines are over the septic, and the purple line is where the fence is.  Michael broke a couple of ribs when they were drilling the wells up there just before Pastor’s Conf., so he was the boss of the job while others did the heavy lifting and such.  Papa did the actual concrete work, and I was his go-fer.  🙂

IMG_2772IMG_2773

IMG_2778

Putting in the stakes for the footer height

IMG_2779

Wilmon mixing cement, and others hired to carry it

IMG_2783

Papa making the footers

IMG_2793

Michael cutting re-bar

IMG_2795

Clean up

After Papa left later in the week, Michael and I had some other things to do.  Then we worked on the property some more.  We set the gate posts, formed up and poured the cap on the front fence wall, and did other various jobs that needed done.

Looking at plans and measurements

Looking at plans and measurements

Cleaning out the post holes

Cleaning out the post holes

Getting ready to set the posts in

Getting ready to set the posts in

This next picture is from outside of the left fence line on the land.  The rig there is the well driller.  The black barrel in front of the rig is where our well was drilled, and to the right of that is where the driveway comes down from the road.

IMG_2895

Finishing the low wall in front of Wilmon's house. The fence will be on it.

Finishing the low wall in front of Wilmon’s house. The fence will be on it.

This wall is capped!  It takes a lot longer to do it in Haiti than it would in the States. :(

This wall is capped! It takes a lot longer to do things in Haiti than it does in the States.  But it is a job well done thanks to Michael!